Specifications include, but are not limited to: Flooring Responsibilities: Estimate 1. Measure site and assess needs. 2. Provide flooring plan of unit, with measurements noted. 3. Provide estimates for material and labor. 4. Provide estimate start date and time to complete workorder. Prep Work 1. Coordinate schedule with MHA Foreman and tenant. 2. Inspect floor and sub-floor, repair or replace broken or dry-rot areas. 3. Cut out and replace worn or damaged floor covering. 4. Clean and level base surface to form smooth, clean foundation. Installation 1. Apply appropriate adhesive to subfloor for vinyl and vinyl plank. 2. Where applicable, install appropriate underlayment or prepare floors with floor leveling compounds. 3. Install floor covering(s) per manufacturer’s instructions and specifications, and if applicable, the same direction as existing/adjacent layer. 4. Form tight joint sections of sheet covering. 5. Install base cove as required. 6. Install stair treads as required. 7. Install transitions/guides as required. 8. Clean work area. Disposal 1. Remove all work-related debris from unit. 2. Properly dispose of all debris per city and state regulations. 3. Do not place debris in MHA disposal containers.