Specifications include, but are not limited to: The Town is requesting proposals from qualified bridge engineering, rehabilitation, and restoration firms for professional rehabilitation and restoration consultant services for the rehabilation and restoration design and preparation of bidding and construction documents for rehabilitation and restoration work of the Old Boardman Bridge, designed and constructed by the Berlin Iron Bridge Company. The bridge is a historic steel truss bridge structure over the Housatonic River, off of Boardman Road and was originally built in 1888, with an overall length of approximately 188 feet and a deck width of approximately 15 feet. The Old Boardman Bridge is a Historic Bridge and is listed on the National Register of Historic Places. Phase I - Preliminary Bridge Inspection, Evaluation, and Conceptual Rehabilitation Plan. • Inspect and evaluate bridge components • Sample hazardous materials including the paint • Attend one public meeting to obtain public input • Conduct an historic review of the bridge • Prepare conceptual rehabilitation and restoration plan • Prepare initial cost estimates for the conceptual plan • Prepare rendering for the conceptual plan • Prepare tentative project schedule • Prepare a PowerPoint presentation and attend one Town Council meeting to discuss conceptual design Phase II - Design & Construction Documents; • Perform project coordination including meetings with Town representatives including preparation of minutes • Development of preliminary plans, specifications and construction design documents, to include 30%, 90% and final drawings. • Development of detailed cost estimate • Submission of Preliminary Plans, Estimate, and Specifications to Town for review, and attending review meeting • Preparation of all permits for Town submission as may be required • Development of final construction plans and specifications with submission to Town and attending a final review and approval meeting