Specifications include, but are not limited to: The Project includes the following Work: roadway and utility reconstruction of St Wenceslaus St from E Sullivan St to E Fond du Lac St. Utility Construction: approximately 1,200’ of PVC water main (4” –8”) including valves, hydrants, appurtenances and services; approximately 750’ of PVC sanitary sewer (8”–12”) including manholes and laterals; approximately 2,000’ of storm sewer, RCP and HDPE (12”–36”) including manholes and inlets. Roadway Construction: approximately 1,100’ of roadway excavation and grading, geotextile fabric, breaker run, dense graded base, hot mix asphalt, concrete & asphalt driveway replacement, concrete sidewalk and concrete curb & gutter. Tree removal, clearing, grubbing, site restoration, traffic control and erosion control are included in the project. The project is being partially funded by Wisconsin DOT LRIP. The anticipated substantial completion date is October 25, 2024 and final completion date is November 8, 2024.