Specifications include, but are not limited to: A. The Work consists of furnishing all the labor, materials, equipment, services, and permits necessary to complete the repairs and rehabilitation defined within the Contract Documents and as identified during a Pre-Construction conference by the Engineer, City Inspector, and Contractor and as summarized herein. B. Work incidental to the repairs, including, but not limited to, repainting traffic markings, use of temporary shoring devices, use of temporary traffic control measures, and protection of persons and property is also included in this project. C. Contractor is responsible for completion of a visual survey and surface sounding of the parking garage to identify and clearly mark repair locations. Repair locations must be marked prior to the pre-construction conference. Contractor is responsible for determining actual extent and locations of repair areas in accordance with the bid documents and in coordination with the Owner and Engineer. Areas shown on the plans only represent typical types and approximate locations of repairs or deterioration. D. Work shall be substantially complete and ready for occupancy within the date set forth in the Instructions to Bidders. Substantial completion will be provided for the project as a whole, not by repair type or installation dates. E. The Work of Project is defined by the Contract Documents. F. Type of Contract: 1. Project will be constructed under a single prime contract between Owner and Contractor.