Specifications include, but are not limited to: Boundary and Topographic Survey, Utility Base Map Data Collection($29,920)– This task will complete Field Survey to support construction documents as well as collect utility as-builts and blue stake data to generate a utility base map.Geotechnical Analyses ($17,650)– This task will perform geotechnicalanalyses to support design and construction.Existing and Proposed Hydrology and Hydraulic Analyses ($23,400)- Thistask consists of refinement of the hydrology and hydraulic analyses conductedpreviously as part of the North Carson Area Drainage Plan completed by Carson City, the Carson Water Subconservancy District, and FEMA in June 2020.Outreach/Public Meeting ($6,540) –This task will conduct a public meeting tosolicit input on basin design and aesthetics. Civil Design, Landscape Design, Stormwater Pollution Prevention Plan($123,860) –This task will complete plan production with milestones at 30%,60%, 95%, and final. The final deliverable will be plans, specifications, and a cost estimate for construction of the basin. A complete design of landscape features and revegetation plan to support the basin construction. Develop a StormwaterPollution Prevention Plan for inclusion in the final plan set