Perform all required individual bridge inspections as indicated on the Cost Proposal for the 2024/2025 cycle. Reports of the 2024 & 2025 inspections shall be entered into the HSIS database per WisDOT requirements. Additional update information that cannot be entered into the database shall be submitted directly to the WisDOT bridge section. B. For all bridges requiring a structure inventory and assessment inspection, the provider is responsible for updating the structure inventory and assessment forms to the New SNBI elements using both existing plans sets and field measurements. C. The provider is responsible for reviewing past inspection reports and/or conducting site visits to determine necessary inspection methods and equipment required to conduct all bridge inspections. All equipment required for the inspection shall be provided by the consultant with the exception of the reach-all truck. 1. Dane County will coordinate with WisDOT for the use of WisDOT’s reach-all truck to perform inspections. D. A summary report stating the overall findings of the bridge inspections and recommended bridge maintenance work for each structure shall be submitted to the County no later than December 15, 2024 and 2025 respectively.