Specifications include, but are not limited to: Design: A design will need to be provided. This needs to be done with water efficiency, budget, and easy operation in mind. Ordering and installation of system. Check with the park team and blue stakes before excavation or trenching begins. Trench or excavate to install new system. Coordinate with parks to find required power and location of controls. Clean up and backfill site. No construction permit will be needed. Use existing connections and backflows. This will allow us to not include the state building official. Inspections will be done by the park staff and the Parks construction project manager. This will be done to insure the scope is being followed. Close out: Please provide any O & M’s, Parts and labor warranties, Redline drawings if changes are made and Training for the staff. This will make sure that the staff has all the necessary training and documents moving forward.