Specifications include, but are not limited to: 3.8.1.1 This is new construction in the team’s facility at Headington Tennis Center. Construction began in December 2023 and is expected to be complete in November 2024. Locker installation is expected to occur between October and November 2024. See layout in Appendix C. 3.8.1.2 Exterior Dimensions – Ceiling height is 8’ tall 48” wide x 24” deep; 3.8.1.3 Interior Specifications; 3.8.1.3.1 Need a padded seat with storage underneath; 3.8.1.3.2 Need storage for a racquet bag, 6 racquets, 8 pairs of shoes; 3.8.1.3.3 Need lockable storage with digital lock type; 3.8.1.3.4 Need a 110V outlet with USB & USB-C charging capabilities, one outlet per locker; 3.8.1.3.5 Provide electrical plans on how locker power will connect to building power with submittal; 3.8.1.4 Need a space on front of locker for locker nameplate; 3.8.1.5 Need school branding on lockers OU, OKLAHOMA, SOONERS, etc., see approved logos in Appendix D; 3.8.1.6 14 lockers for men’s tennis and 14 lockers for women’s tennis; 3.8.1.7 Need wood lockers with gray stain; 3.8.1.8 Contractor responsible for all clean up and proper disposal of all debris; 3.8.1.9 Contractor must submit drawings of proposed design and list of materials to be used, including color samples