Specifications include, but are not limited to: UNION AND BAKER COUNTIES: I-84: La Grande – Baker City Sign Upgrades Project on the Old Oregon Trail Highway (Rt. No. I-84) beginning in La Grande. FAP No. S006(177). ($ 2,000,000 - $ 5,000,000). Req. approx. 1,400 ft2 temp. signs; 2 ea seq. arr. signs; 4 ea PCMS; 2 ea rdr. spd. trlr.; 130 hrs flag.; 6 ea flag. sta. light.; 200 hrs pilot cars; 2 ea TMA; 1,525 ft sed. barr.; const. surv. wrk.; 78 yd3 exc.; 1,500 yd3 st. emb.; 850 ton aggr. shldr.; 744 ft gd. rl.; 342 ft cab. barr.; 60 ft2 signs; 195 ft sign sup. drill. shft. found.; 105,900 lb st. in sign sup.; 9 ea ITS elec. sys. install.; 1 acre seeding. Completion Time: August 22, 2025. Classes of Work: A) Signing, or B) Electrical.