Specifications include, but are not limited to: The awarded Contractor(s) shall provide all materials and labor necessary to furnish the athletic scoreboard as described below and in Exhibit 1. Contractor(s) shall provide all tools, material, and supplies necessary to perform specified task(s). a. To fabricate, supply, deliver, and install: i. (1) New single faced 6’ x 16’ Electronic Scoreboard with controller box, communications and horn. Vendor to add vinyl copy (SCHS logo) to the scoreboard. ii. (1) single faced 4’ x 16’ 10mm EMC (Electronic Message Center) with wireless communication. iii. (1) 2’ x 16’ Pop Johnson Field @ Spruce Creek High School sign panels. iv. Perforated mesh printed banner with grommets on backside of the scoreboard with HAWKS 50th anniversary logo. v. Beams: Scrape steel rust, prime and paint existing steel black. vi. Add any steel horizontals for added support if needed. vii. Connect to existing electrical; (2) 20 Amp 120V circuits at the board. viii. Removal of the existing scoreboard. b. To provide detailed drawings of the proposed scoreboard and installation.