Specifications include, but are not limited to: Contractor Requirements: • The Contractor must validate that the equipment is properly packaged for the move and supply any necessary materials. • The Contractor must supply two new tip indicators, as the current tip indicators have been voided during asset tagging activities. • The Contractor must move the equipment from the SOCC to the Sterling Forest, New York facility via a an enclosed, weather proof truck. • The Contractor must provide INSIDE pickup and delivery of the equipment and the equipment must be signed for at the Kyndryl site before Contractor can leave. • Contractor must insure the equipment for a minimum of $1,125,000.00. o Bidders must include proof of insurability with the quote. o The Contractor must provide evidence of the required insurance prior to equipment pickup. • The Contractor must move the equipment through the SOCC to the dock for pickup. • The Contractor must load and unload the equipment from the truck. • The Contractor must place the equipment in the secure State of Ohio cage at the Sterling Forest facility at delivery. • Bidders must include three references in their quotes. • Bidders must have previous experience moving heavy (>1,000 lbs.) computer equipment and provide documentation of such experience. • Bidders must answer all questions within the OhioBuys questionnaire.