Specifications include, but are not limited to: Furnish all materials, labor, equipment, and incidentals for the following work: Legion Rd Turn Lane and Intersection Improvements. To accommodate increased truck traffic, a right turn lane from US 68 to Legion Road will be constructed. The existing 10’ shoulder will be tapered to 4’ along the length of the turn lane, with the full width shoulder to be constructed downstream of the intersection. The existing intersection of Legion Rd will be widened to 54’ to provide two exit lanes and a flush striped median. Pipe Replacements & Extensions. There are locations throughout the project where culvert pipes are being extended or replaced. Locations and estimated quantities are noted on the Drainage Summary. For pipe extensions where the existing pipe is RCP, remove the existing headwall and first section of existing RCP attached to the headwall (approx. 3 to 4 ft of existing pipe). Other items that may be included with the pipe extensions/replacements include culvert headwalls, sloped & mitered concrete headwalls, intermediate anchor/collar, roadside regrading, ditching, channel lining, erosion control blanket, asphalt pavement quantities, etc. Refer to the Special Note for Pipe Replacements/Extensions for more information on this item of work. Guardrail. One location within the project boundary is set up for guardrail replacement. The approximate locations and estimated quantities are noted on the General Summary and Plan Sheet. Refer to the Special Note for Guardrail, Typical Sections, and Plan Sheets for more detail and information on this item of work. Remove, Store & Reinstall Signs. A quantity of 2 each of “Remove-Store and Reinstall Sign” has been included in the contract for existing sheet signs that may obstruct or interfere with proposed construction activities. Do not remove an existing sign until just prior to working in the vicinity of the sign. Reinstall the sign as soon as possible once the construction activities in the vicinity of the sign has reached a stage that the sign will no longer be an obstruction or interfere with the work. The intent is for the sign to be “down” the minimum length of time necessary...