Specifications include, but are not limited to: Base Bid: Runway 2/20 Rehabilitation, Alternate Bid #1: Runway 2/20 Lighting Replacement, Alternate Bid #2: Airport Owned NAVAIDS Improvements, Alternate Bid #3: Taxiway Relocation, Alternate Bid #4: Taxiway Lighting Installation. Estimate of major quantities: Base Bid: Excavation Common 2,950 CY; Borrow 9,400 CY; Base Aggregate Dense 1 ¼” 2,600 Tons; Pulverize and Relay 62,250 SY; HMA Pavement 3MT 58-34 S 8,250 Tons; HMA Pavement 4MT 58-34 H 6,350 Ton; Salvaged Topsoil 66,250 SY; Mulching, Method B (Wood Fiber) 66,250 SY; Painting, White, Waterborne, Type I 19,100 SF. Alternate Bid #1: No.8 AWG, 5KV, L-824, Type C Cable 12,600 LF; Non-Encased, HDPE Electrical Conduit, 1-Way 1-1/4-Inch 11,850 LF; Medium Intensity Runway Lights, L-861(L) Base Mounted 50 EA; LED L-858(L) Guidance Sign, 2-Module 4 EA; New Regulator for Runway 2/20 Circuit – 7.5 KW 1 EA. Alternate Bid #2: REILS Constant Current L-849I(L), Style A 2 EA; Runway 20 PAPI L-880(L), Style B, Class II 1 EA. Alternate Bid #3: Excavation Common 4,250 CY; Borrow 1,900 CY; Base Aggregate Dense 1 ¼” 1,100 CY; Select Crushed Material 2,050 CY; HMA Pavement 3MT 58-34S 600 Ton; HMA Pavement 4MT 58-34 H 475 Ton; Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 14x32-Inch 272 LF; Mulching Method B (Wood Fiber) 12,600 SY; Geotextile Type SAS 9,600 SY; PVC Pipe Underdrain 6-Inch, Complete Including Porous Backfill No.2 and Separation Geotextile, Class 2 1,900 LF. Alternate Bid #4: No.8 AWG, 5KV, L-824, Type C Cable 2,650 LF; Non-Encased, HDPE Electrical Conduit, 1-Way 1-1/4 Inch 2,300 LF; Medium Intensity Taxiway Lights, L-861T(L), Base Mounted 31