Specifications include, but are not limited to: 1. Demo existing tub/shower and shower trim kit. 2. Supply and install Flexstone Royale Alcove Shower Surround Kit for openings up to 60” W x 36” D x 80” H. Include supply and install of 2 15 in. corner shelves. Supply and install Flexstone single threshold shower base with correct sided drain opening. All components to be Crème Travertine in color. Contractor shall include all materials and labor necessary for installation per manufacturer’s instructions, including but not limited to the shower drain and backer boards for walls. Contractor is responsible for field measuring to ensure that new tub fits in the opening without leaving a gap in the flooring at shower edge. 3. Contractor shall supply and install plywood backer for the shower surround. 4. Contractor shall include all costs associated with moving plumbing to align with the new showers. 5. Contractor shall include all costs associated with adjusting the opening to fit the new shower. Shower shall fit without leaving a gap in the flooring at shower edge. 6. Supply and install Seachrome 24”w x 15” wall mounted folding shower seat, white phenolic with 3” slats.. 7. Supply and install grab bars in shower per MN Accessibility Code. 8. Modify existing shower valve assembly to eliminate tub spout (shower function only) Existing shower head may remain in place. Contractor shall include installation of a shower divertor valve and install Moen handheld showerhead combo with slide bar (Moen 3667EP) chrome finish. 9. Patch, tape and texture drywall around the new tub as needed, including any adjustment for difference in shower sizing; prime and paint all affected drywall surfaces in the bathroom. All (new and existing) texturing to match as closely as possible. Prime drywall with Zinsser mold killing primer. Paint walls to match existing. When complete, the expectation is that all the paint and texturing on the bathroom walls looks as uniform as possible. In the event that no painting is needed, the amount shown on the schedule of values for painting will be credited back. 10. Demo and replace all smoke detectors with spec combo smoke c/o detectors as needed to meet code compliance. 11. Re-locate existing shower curtain rod to work with new shower. Provide new full length shower curtain. 12. The expectation is to complete this shower installation without needing to move the tenant out. They will be told that they cannot use their shower for a couple of days but will need to have continued access to use their toilet. 13. Contractor shall supply and install a grab bar behind the toilet stool. 14. Contractor shall include 0.5% TERO tax fee in base bid. Submission of receipt for paid TERO fee is required with application for final payment. 15. Permit through MLBO. Be sure to figure permit fee according to the updated fee schedule.