Specifications include, but are not limited to: 1. REMOVE DAMAGED BRICK FRAME STRUCTURE; 2. FIELD VERIFY ALL SITE CONDITIONS; 3. REMOVE CMU/BRICK PIERS AND OR CONCRETE SLAB(S) FIELD VERIFY; 4. REMOVE ALL TIRES, TRASH, ROOF REMNANTS, GARBAGE, ETC. OFF SITE; 5. ALUMINUM FENCE SHALL REMAIN; 6. REMOVE ALL VINES, BUSHES, SHRUBS ALONG THE ENTIRE PERIMETER AND CUT TREES WITH A CALIPER OF 8" OR LESS 4" ABOVE GRADE WITHIN THE PROPERTY LINES/FENCE LINE. 7. CLEAR ENTIRE LOT, REMOVE ALL TRASH/GARBAGE, CUT ALL GRASS/WEEDS UP TO PROPERTY LINES. 8. CONTRACTOR SHALL FILL ALL VOIDS OF DISTURBED AREAS PER SECTION 02100 DEMOLITIONS BY WET METHOD AND SECTION 02100 SEEDING. 9. CONTRACTOR SHALL PROVIDE, INSTALL AND MAINTAIN ALL TEMPORARY EROSION CONTROL MEASURES. (FULL PROTECTIONS OF STATE WATER-DOG RIVER WATERSHED); 10. CAP ALL SEWAGE LINES AT THE CURB: NOTIFY MUNICIPAL ENFORCEMENT DEPARTMENT WHEN SEWAGE LINE IS CAPED. 11. BEFORE AND AFTER PHOTOS ARE REQUIRED WITH PAY REQUEST.