Specifications include, but are not limited to: 1. Demo and dispose of all existing steps, concrete footers, and other associated materials. 2. Prepare site for new steps and footings. a. Pour new concrete footings and/or piers (sonotubes) as required to disperse weight of the steps. b. Pour new four-inch (4”) thick by four feet (4’) by three feet (3’) concrete pad to support bottom tread(s) and/or landing areas located at the bottom of each set of steps. i. Pad should not extend beyond the building edge. c. Grade shall be level at bottom of steps. d. Backfill area and grade disturbed areas. 3. Furnish and install new steel steps. a. Steps shall be powder coated in black. i. Steps may be prefabricated or may be constructed and installed on site. 1. If constructed on site, reference Stairzone drawings for step and platform designs. b. Attach steps to building with the appropriate fasteners. i. New fascia boards and/or concrete must match existing building design. 4. Clean Project site of all debris, including the running of magnets in landscaping, driveways, and surrounding areas. 5. Provide one (1) year workmanship warranty and manufacturers standard material warranty.