1. Demo and replace all carpeted areas, to include supply and install all new pad. Use floor leveler as needed. Include triangular end of living room near garage entry which is currently plank. Carpet selection: Dreamweaver Parade Vale Mist. 2. Demo kitchen, dining room, hallway and under stair closet plank flooring. Grind and prep subfloor as needed for a neat even finished appearance, including floor leveler, if needed. Supply and install Shaw Paragon Tile Plus Catalina flooring. Install per manufacture’s specifications. 3. Demo and replace transition strips at 4 door thresholds along the hallway. 4. Homeowner wants to remain in the house throughout construction. As such, flooring will need to be completed in 2 stages. a. Phase I - starting with LVT areas. Homeowner will move furniture himself, including kitchen island. b. Phase II – carpet in living room. Homeowner will move furniture out/ into garage himself. c. Homeowner will move his furniture back after flooring is complete. 5. See provided flooring layout with dimensions. Contractor shall include normal % of sq ft overage that they would any other estimate as not everything measurement within the area was verified. 6. Contractor is responsible for disposal of all removed flooring debris and any waste generated by this project.