Specifications include, but are not limited to: First floor work includes: 1. Assist school staff to temporary protect and relocate furniture at affected room. 2. Protect all devices, cables, conduits above ceiling at the affected area. It is the responsibility of the contractor to repair any damage as a result of the construction. 3. Sawcut and remove existing concrete floor and flooring tile at the affected area. 4. Connect new plumbing sanitary line to existing line in. See plumbing drawing for approximate location based on record drawing. 5. Construct new chase wall to protect the plumbing sanitary line and clean out. 6. Repair concrete slab on grade and vapor barrier to match existing adjacent. 7. Floor tile repair to match existing whereas possible. 8. Perform clean up after work is complete. 9. Restore ceiling and grid after work is complete. Second floor work includes: 10.Construction of 6” chase wall with 3 5/8” metal stud at 16” o.c. with 5/8” gypsum board. 11.New plumbing connection for sinks, dishwasher, clothes washer. 12.New electrical circuits, panel, and final connection for all the new appliance include but not limited to electric range, dish washer, refrigerator, freezer, clothes washer and dryer, microwave, vent hood etc. 13.New residential type vent hood with fire suppression. 14.New Upper cabinets and base cabinets work 15.New solid surface counter top 16.New rubber base under millwork 17.New fire extinguisher and cabinet 18.Miscellaneous painting and touch up 19.Wall or floor repair for utility routing 20.Reprograming for alarm panel.