Specifications include, but are not limited to: Phase 1 includes the construction of approximately 2,500 lineal feet of 10” PVC (C900/DR-18) water main, 360 lineal feet of 8” PVC (C900/DR-18) water main, 100 lineal feet of 6” PVC (C900/DR-18) water main, 340 lineal feet of 8” HDPE (DR-11) directional bore water main, 6” through 12” wet tap connections to existing mains, asphalt roadway open cut and repair with final mill and resurfacing, concrete curb removal and replacement, isolation valves, fire hydrants, new residential services, relocation of existing meters requiring access to private property and City of St. Cloud applicable permits and the usual appurtenances. The Project also includes the abandonment in place of existing water mains via grouting. The CONTRACTOR shall note that some existing water mains are asbestos cement pipe and if sections are removed all applicable regulations will apply in regards to handling and disposal of the materials.