ON A WEEKLY BASIS THE VENDOR WILL PERFORM THE FOLLOWING MAINTENANCE IN THE UNIVERSITY'S POOL FILTER ROOM, IN THE POOL | AREA AND IN THE GAS STORAGE AREA: | 1) BACKWASH ALL THREE POOLS. | 2) CHECK THE OPERATION OF THE PULSAR UNITS, TO INCLUDE CHECKING & CLEANING THE GRATES AS NEEDED. | 3) CHECK AND CLEAN LINT AND HAIR BASKETS AS NEEDED. | 4) CHECK AND CALIBRATE CONTROLLERS TO MATCH POOL READINGS. | 5) CHECK AND SERVICE CHEMICAL CONTROLLERS AS NEEDED, INCLUDING THE CO2 INJECTOR DEVICES. | 6) PERFORM WATER ANALYSIS AND PERFORM CHEMICAL BALANCING AS REQUIRED. | 7) SUPER-CHLORINATE POOLS AS NEEDED. | 8) PROVIDE SERVICE AND REPAIR TO ISOLATION VALVES, WATER LEVEL CONTROLLERS AND PULSAR PUMPS. | 9) VISUALLY CHECK FILTER ROOM AND ALL POOLS FOR PROPER OPERATION AND REQUIRED REPAIRS. | 10) LOG ALL MAINTENANCE PERFORMED AND DATA IN THE LOG PROVIDED, TO INCLUDE TECHNICIANS NAME, DATE AND TIME OF ACTIVITIES. | 11) PROVIDE ESTIMATES FOR REPAIRS TO POOL PLASTER, PIPING, VALVES AND OTHER POOL OPERATION DEVICES NOT ASSOCIATED | WITH THE ROUTINE REQUIREMENTS. | 12) THE TASKS DESCRIBED ABOVE ARE GUIDELINES ONLY AND OTHER POOL AND FILTER ROOM ASSOCIATED TASKS MAY BE REQUIRED | FOR THE CONTINUED AND PROPER OPERATION OF THE UNIVERSITY POOLS. | 13) IT IS ANTICIPATED THAT THE TASKS LISTED WILL REQUIRE 4 HOURS PER WEEK OF LABOR TO ACCOMPLISH. | 14) THE CONTRACTOR SHOULD BE AWARE THAT THE AQUATICS PROGRAM IS PERIODICALLY OFF LINE. DURING THOSE SHUT-DOWN PERIODS | ANY OTHER MAINTENANCE REPAIRS MAY BE COORDINATED BETWEEN THE CONTRACTOR AND THE UNIVERSITY. | 15) UPON ARRIVAL, THE CONTRACTOR'S TECHNICIAN WILL CHECK-IN WITH THE UNIVERSITY'S REPRESENTATIVE AND CHECK-OUT UPON | COMPLETION OF WORK. A VENDOR CHECK IN/ CHECK OUT TIMECLOCK LOCATED IN THE SHERMAN BUILDING WILL BE USED BY THE | VENDOR FOR INVOICING AND RECORD KEEPING. | 16) CORRECTIONS REQUIRED BY THE RHODE ISLAND DEPT OF HEALTH SUCH AS SIGNAGE AND PH ADJUSTMENTS WILL BE PERFORMED | BY THE VENDOR AFTER REVIEW OF THE CORRECTION SCOPE AND DIRECTION TO PROCEED FROM URI STAFF.