Specifications include, but are not limited to: This Project is for the site development and construction of a new facility to house a Police Intelligence Center, Police Precinct 2 and Police Property Storage. The Contractor’s responsibilities include furnishing all labor, materials, and equipment necessary to complete the Project, which at a minimum include the following: 18.1.1 Provide all tree clearing indicated on the drawings and necessary for the installation of the work, including tree clearing necessary for site utility installation. Remove / dispose of cleared material offsite. 18.1.2 Provide all mass excavation and grading. 18.1.3 Remove or import soil as necessary to achieve the grades indicated on the plans. 18.1.4 Provide all storm sewers and sanitary sewers. Connect all utilities to the public systems. 18.1.5 Provide the water quality bio-basin plantings. 18.1.6 Provide required notice to the Department of Labor prior to beginning work. 18.1.7 Develop and implement a Stormwater Pollution Prevention Plan (SWPPP) and provide SWPPP reports per Missouri Department of Natural Resource standards to the County at weekly meetings and immediately following each rain event. Continue this work through the completion of the project.