Specifications include, but are not limited to: For Field Office Maintenance and Janitorial Services for this project shall be paid for from the allowance amount assigned; For all work as specified and shown on the contract drawings and/or hereinafter specified, and work not included in other Bid Items; For furnishing and installing all materials and equipment required to address concrete slab crack repair work as described on the contract drawing S-1.0; For furnishing and installing all materials and equipment required to address spalled concrete repair work as described on contract drawing S1.0; For furnishing and installing all materials and equipment required to address corroded and jacked steel lintels as described on contract drawing S-1.0