Specifications include, but are not limited to: Furnishing 700 tons of 4LT Hot Mix Asphalt Material for W. Whitefish Bay Road, LRIP Project Request# 136513, from Mathey Road to Country View Road, for the Town of Sevastopol. All hot mix material to be loaded onto Door County Highway Department trucks for delivery and placement at jobsite. The Hot Mix Asphalt Material work consists of preparation of mixture for Hot Mix Asphalt Pavement, Type 4LT. All projects are hot mix purchase and are to be all loaded onto Door County Highway Department trucks for delivery and placement at jobsite. The requirements of the following sections and subsections of the Standard Specifications for Highway and Structure Construction of the State of Wisconsin, Department of Transportation, latest edition (203) include: 450 General Requirements for Asphaltic Pavements; 455 Asphaltic Materials; 460 Hot Mix Asphalt Pavement; The quality management program will not be required for this contract.