Specifications include, but are not limited to: : The work for this project at Beaverdam Park, consists of labor for removal of existing EZ Dock fishing pier and pile anchors and installation of a new, ADA compliant EZ Dock Float System fishing pier and anchors as shown in drawings. All new EZ Dock components will be purchased by the County and delivered on site to Beaverdam Park on a date to be arranged between the Project Manager and the successful Contractor. The existing aluminum gangway shall be reused. New fishing pier will have (4) benches, (1) boat port and aluminum railings around most of the perimeter. Contractor shall supply (10) - 2” galvanized anchoring pipes and (10) - 3” Schedule 40 PVC pipe sleeves with caps.