Specifications include, but are not limited to: 1. Entrance Area: Driveway modifications at the site driveway entrance from Highway 99E, which includes: widening the existing driveway, adding concrete median islands, installation of automated swing arm barrier gates, installation of lights, cameras, and audio equipment to allow observation and communication with arriving vehicles, construction of a new driveway loop and utility building, new electrical service and fiber to the areas, and signing and striping. 2. ALTERNATE 1 – Fence installation along the site highway frontage and in the vicinity of the driveway entrance modifications, as specified on the Highway 99E Area site plans (“Highway 99E Area Fence B”). 3. ALTERNATE 2 - Hammerhead turnaround for large trucks near the main parking lot as shown on the Hammerhead Area site plan, and includes demolition, paving, and landscaping (“Hammerhead Area”).