Specifications include, but are not limited to: • EROSION CONTROL BMP’s including mulch, temporary grassing, inlet sediment trap, silt fence, and sodding. • SITE WORK including clearing & grubbing, demolition of stormwater structures, grading and excavation. • CONCRETE PAVING including construct concrete curb & gutter, construct 5.00’ sidewalk, and reconstruct residential driveways. • GUARDRAIL. • STORM DRAIN STRUCTURES INSTALLATION including catch basin and rip rap. • STORM DRAIN PIPE INSTALLATION including RCP, exacavation, and compaction. • Re-grout all exist. structures & site clearing. • The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the Drawings and as described in the respective section of these specifications. • All work shall comply with all Federal, State, and local requirements and specifications. • The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation, shall govern the construction of this project.