Specifications include, but are not limited to: The Consultant shall provide: A. Concept: 1) Conceptual right-of-way cost estimate utilizing vendor from GDOT’s Right-of-Way services prequalified contractor list. 2) Conceptual construction cost estimate. 3) Prepare concept layouts and alignments alternatives. 4) Concept Design Data Book. 5) Concept team meeting preparation and attendance. 6) Approved Concept report. 7) Public Involvement Plan (for Community approval). 8) Project Management Plan (for Community approval). B. Survey: 1) Survey Control package. 2) Complete Survey database. 3) Property Information and Owners Report (with updates). 4) Complete stream hydraulic surveys streams. 5) Extended survey limits, if needed. 6) Video inspection of existing pipe conditions, by qualified vendor. 7) Survey package report. C. Environmental Document: 1) Necessary Environmental Special Studies Survey Reports, and Assessment of Effects for Air, Noise, Ecology, Aquatics, Archaeology, History, and NEPA. 2) Agency coordination including multiple meetings to ensure consistency of expectation, design, and clearance limits. 3) NEPA Documents: a) Environmental approval. b) NEPA re-evaluations, as required. 4) 404 Permit applications and Stream Buffer variances. 5) Section 7 coordination. 6) Protected Species Surveys including Aquatic and Terrestrial Surveys, as required. 7) Public Involvement (Public Involvement Open House (PIOH)) and associated coordination with the Community. 8) Perform A3M activities. 9) Prepare for and attend the Preliminary Field Plan Review (PFPR), Constructability Review, and Final Field Plan Review (FFPR). 10) Certification for Right-of-Way. 11) Certification for Let. 12) TPro and P6 updates. 13) Preparation of Environmental Commitments Table “Green Sheet” and Environmental Resource Impact Table (ERIT). 14) Phase 1 and Phase 2 Underground Storage Tanks and Hazardous Waste Studies...