Specifications include, but are not limited to: The project will include the following elements: 1. Intersection Improvements 2. Parking along Hiawatha Drive 3. Curb and Gutter 4. New Covered Bridge Signature Building 5. Walking Paths and Plazas; A draft summary of Scope of Services is included below. The final Scope of Services will be negotiated with the selected CMAR. The proposal shall include any comments or suggested changes to the draft summary Scope of Services. I. Preconstruction Phase Services: A. Value Engineering services shall include a thorough review of the completed design drawings and specifications and the identification of any alternative design components, construction methods, or materials that could reduce the cost of the project without sacrificing project quality. B. GMP Development will commence upon the completion of 60% design plans and specifications. A pre-construction GMP development schedule shall be provided to be reviewed by GMC. The costs for each developed GMP for 60% and 100% shall be developed according to the schedule through an open‐book process. CMAR will provide a GMP within 20 Business Days of receiving 60% and 100% documents from GMC. The City of Anderson requires that for those components of the Project that the CMAR may want to self‐perform, the CMAR will need to submit bill rates, overhead, markup on subcontractors, profit rates, and other similar financial information for that scope. The amount of work self-preformed by the selected CMAR will be limited to 20% of the 100% GMP. The GMP will also include CMAR overhead costs and margin for all work under the Construction Phase Services Agreement, as described in the following outline of CMAR Construction Services, as well as any contingency allowances. Formal pricing, as required in the preconstruction phase, should occur at the following design intervals: 60% and 100% (GMP)...