Specifications include, but are not limited to: The purpose of this project is to replace the existing Pump Station #24 with a new submersible duplex pump station. The Consultant will provide drawings and specifications for the demolition of the existing pump station, design of a new pump station and site improvements to reduce stormwater runoff on-site. The Consultant shall be capable of providing any and all of the following items in order to produce complete project analysis, project design drawings and/or technical specifications. Data acquisition: land surveying, technical research, public records research, existing wastewater flows, drainage and hydraulic conditions, geotechnical analysis, existing facility dimensions, conditions, capacities, and other data acquisition as required. Project Design: geometric layout of existing and proposed conditions, hydraulic and wet well calculations, engineering analysis, structural design, drainage design, construction details, plans and specifications. Quantities: provide a breakdown of pay items. Engineer’s Opinion of Probable Cost based on lump sum or unit prices as appropriate. Hydraulic analysis and layout of existing and proposed conditions of the site. Technical specifications for work not included in the City of Lakeland Construction Specifications. Other ancillary responsibilities and submittals as needed for a full and complete set of construction plans and specifications in a form acceptable to the City of Lakeland.