Specifications include, but are not limited to: Greenhouse Structure Kit and Installation- To be purchased with Grant Funds; Grant Expiration date 07.31.24 Example Model: Allied Educator Series or TJJD approved equal. TJJD Maintenance will provide the Dig Permits, labor for Electrical, Drainage, labor for Plumbing (needed outside of Plumbing), Site Preparation and mark underground Utilities, prior to construction. Perkins Grant will provide wire, conduit and any other materials needed for Electric as well provide the PVC/materials for Plumbing- Spigots, Cooling Systems and Irrigation Systems, if ordered. Spec Info: 24ft Wide by 48ft Long, with 8ft Sidewalls .2- 36" Slant Wall Exhaust Fan 3/4hp 1- 39" Motorized Shutter 1- 4 x 15 ft. Automatic Wall Vent 1- Electric heater. 2- 18" Horizontal Air Flow Fans (HAF) 2- 42" x 6' - 6" - 3/4 Glass, A.D.A. compliant single swing door(s) with lever action lock and key. Automatic Temperature Control 1- Hanging Basket Rail 1- 25ft x 47ft (1175 Sq Ft.) Shade Cloth Emergency Lighting / Exit Signs / Fire Extinguisher. 10- 4' x 9"- 6" Portable Benches Irrigation- Mist, Fertilizer Injector, Modular Irrigation Controller. NOTE: Mininum of 55 PSI required for proper operation of irrigation sys Plumbing Spigots Shipping Cost Installation: Completion- Supplier will provide all labor and materials to erect greenhouse using experienced, professional greenhouse builders as well as according to manufacture's specifications. Contractor Access: Hours of construction may fluctuate, within reason, but a close estimate will be established between TJJD and the Supplier.