Specifications include, but are not limited to: The City of Pikeville plans to construct a build ready site and receive a KCED certification as such for same, with the site being sufficient for a 100,000 square foot building. The site would be associated with industrial processes at the Kentucky Enterprise Industrial Park, which is a reclaimed surface mine. The primary obstacle to be overcome in this design is the depth and character of the fill material used in the site’s mining reclamation. It consists of approximately 80 feet of shot rock—primarily sandstone and shale—with a size distribution ranging from approximately 1,000 cubic feet pieces down to fine particles, and the shot rock was placed in an uncontrolled manner. Each of the two existing buildings on the site were built using one of two foundation construction techniques that have successfully mitigated differential settlement risks associated with this type of fill.