Specifications include, but are not limited to: Bidder must deliver and install in the Flight Operations Pathway Lab at Morrow High School where students will have access to the equipment during instructional time and project-based learning. 1.2 Bidder must be able to deliver and install the TecQuipment Aerodynamics Equipment within a minimum of ten (10) business days after receiving the CCPS Purchase Order. 1.3 The successful Bidder must schedule the delivery of the TecQuipment Aerodynamics Equipment with the Career, and Agricultural Education (CTAE) Department. 1.4 Bidder must provide the subsonic wind tunnels with equipped advanced measurement and visualization technology. 1.5 Bidder unit cost must include all internal parts and other items needed. 1.6 Bidder must provide the manufacturer’s specification sheet with the bid for each line item on the Bid Cost Form attached hereto as Attachment B. 1.7 Bidder must include the brand and model bidding on the Bid Cost Form attached hereto as Attachment B. 1.8 Bidder must replace any damaged equipment within seven (7) business days after receiving notification by CCPS. 2.1 Bidder must conduct and train the faculty and staff at Morrow High School. The training must include, but not limited to, the operational techniques and maintenance protocols to ensure that the instructors are well-equipped with the knowledge and skills required to effectively operate the equipment. 2.2 Bidder must provide training material for the faculty and staff on any updates related to the equipment at no cost to CCPS.