The Work includes construction as indicated on the construction documents. Madison Elementary School is a new 92,000sf building on the open site of 180 Mungertown Road. Construction on the new building is scheduled to start in January of 2024 and complete in May of 2025. Construction of the new building is not phased. The new building is a combination of one and two story wings with a gymnasium, kitchen, cafeteria, media center and classrooms. It is a steel structure with the exterior comprised mainly of steel stud backup walls with brick façade and metal panel trim. The interior partitions are largely drywall, and the floors are a combination of resilient and carpet flooring. The mechanical system is a geo-exchange system with heat pumps, an indoor DOA unit, and VRF units throughout the building spaces. The new school will have all new services including water, fire, electric and tele/data.