Specifications include, but are not limited to:1. General Duties and Responsibilities of Contractor. 1. Contractor is expected to possess the necessary experience, skills and craftsmanship to construct and grade walking trails with the minimum slope and cross-slope outlined below. 2. Contractor, crew, and any subcontractors associated with this project are expected to conduct themselves in a professional manner at all times and utilize mechanized equipment in accordance with the best practices noted below. 2. Field Layout and Design. The trail centerline has been carefully laid out and flagged, but some minor adjustments may be permitted. If the contractor has any questions regarding the proposed alignment, they must discuss this with Town staff prior to making any changes. If the contractor deviates from the established route, or outside any agreed upon buffer without permission, they may be required to fix the work without additional compensation. 1. Corridor width shall be 8-10 feet wide, or 4-5’ feet to either side of the centerline. 2. Contractor should try to preserve all trees within this corridor and move the trail around them if possible. 3. Tree and plant protection. The Contractor shall protect trees and root systems outside of the defined trail tread, front slope, and back slope area from damage from construction equipment or damage due to soil compaction. The Contractor shall flag any trees or plants designated by the Town Staff to be protected.