Specifications include, but are not limited to: The City of Gig Harbor requests sealed bid proposals for construction of Wollochet Drive/Wagner Way Intersection Improvement Project (CSP-1406). The work to be completed under this contract generally consists of installing a new traffic signal system at Wollochet Drive and Wagner Way intersection, a new Rectangular Rapid Flash Beacon (RRFB) system at a trail crossing on Wagner Way, and new street lightings at the intersection and Tallman Wetland Trail crossing within the City of Gig Harbor. It also includes replacing cement concrete sidewalks, installing ADA curb ramps, cement concrete driveways, cement concrete crosswalks, curb and gutter, removing sidewalk and asphalt pavement, grinding of bituminous pavement, placement of new hot mix asphalt, adjust utility to finish grade, installing pavement marking, installing traffic signage and other work, all in accordance with the attached Contract Plans, these Special Provisions, and the Standard Specifications.