Specifications include, but are not limited to: installing approximately 4,100 linear feet of heat fused SDR11 PE100 pipe in an existing 30-inch concrete pipe. The existing 30-inch carrier pipe alignment has a single deflection angle point of approximately 28 degrees located approximately 2,470 lf from the lake intake. The carrier pipe runs from the intake pump facility at Show Low Lake and extends to the outfall at an existing irrigation canal. Upon award of contract, the bidder is required to provide a work plan that details the location of receiving pits and engineering / manufacturers calculations showing the pull lengths. The selected contractor shall also provide the terminations of the pipe at the intake and outfall per the project specifications. All work will be performed within the existing easements.