Specifications include, but are not limited to: The Project will include a seismically-resilient, two-story pump station building (approximately 30 feet by 37 feet) which includes installation of booster pumps, telemetry, controls, fluoride and chlorine booster station improvements, emergency standby generator, connection to City water transmission mains (36-inch and 24-inch), civil site work, electrical design, instrumentation and controls, mechanical, and plumbing. Additionally, approximately up to 150 lineal feet (LF) of 36-inch CCP water main replacement with welded steel pipe and a meter vault (with an owner supplied 30-inch meter) is to be installed near Cornelius Pass Rd. within an existing utility easement.