Specifications include, but are not limited to: (1) Complete removal and disposal of the existing 33 slate stair trends and 3 landings located in the rear of the main Courthouse facility. (2) Once the stair treads and landings are removed, apply at least one coat of paint to the stair stringers, risers and railings using the same color pallet as is currently present. (3) Install 33 new slate stair treads equivalent in size to the present. Also install 3 landings; 1 square landing approximately 4' x 4', and 2 triangular shaped landings in the specified locations. (4) The stair treads and landings will be made of slate and will surpass all ASTM Grade S1 requirements. (5) Touch up paint after installation, as needed. (6) Install new painted pipe railing continuously along the wall per flight of stair runs that do not currently have a handrail. (7) Removal and disposal of debris, trash, and remnants from the project.