Specifications include, but are not limited to: US101: Urban Upgrade (Garibaldi) Section of the Oregon Coast Highway (Rt. No. US101) in Garibaldi. FAP No. S009(508). ($ 5,000,000 - $ 10,000,000). Req. approx. 1,655 ft2 temp sign; 2 ea PCMS; 3,000 hr flag; 8 ea flag sta light; 1,000 hr pilot car; 2 ea AFAD; 50,000 ft temp stripe; 30,000 ft stripe rem; 2,000 ft PCD; 10 ea temp curb ramp; 5,000 ft2 temp walk; temp water mngt facility (60 ea sandbag, 3 ea pipe plug); 271 yd2 comp ero blanket; 21 ea check dam; ero sed cntrl mngr; 2 ea conc washout; 61 ea inlet protect; 35 ft sed barr; 350 ton contam soil disp; 500 gal contam grndwater rem; 3 ea soil test; const surv work; 2,305 ft rem pipe; 37 ea rem inlet; 24,500 ft asph saw cut; 8,000 yd3 gen exc; 5,822 yd2 subg stabil; 6,648 yd2 subg geotext; 3,416 ft vid insp; 3,145 ft pipe; 25 ea conc manhole; 30 ea inlet; 79 ea adj box; 29 ea minor adj manhole; 194 yd2 trench resurface; 1,210 ft2 retaining wall; 6,492 ft conc curb; 20,850 yd2 AMG CPPR; 5,600 ton aggr base; 11 ton tack coat; 10,255 ton ACP (625 ton PG64-22); 1 ea core corr; 500 yd2 ACP repair; 42 ea asph appr; 2,600 ft2 asph slope pave; 2,500 ft2 conc driveway; 34,053 ft2 conc walk; 2 ea conc stair; 76 ea curb ramp; 6 ea bus pad; 1,038 ft2 trunc dome; 180 ft2 unit paver; 29,516 ft pvmt marking durable; 3,048 ft2 pvmt bar; 5,348 lb sign supp; 656 ft2 sign; 657 yd2 lawn seed; 235 yd3 topsoil; 55 yd3 soil conditioner; 440 ea shrub container; 869 ea groundcover container; 54 yd3 bark mulch; 35 ton rock mulch; 132 ft fence; 292 ft metal handrail; 431 ft potable water pipe. This project requires Railroad Insurance. Completion Time: September 30, 2025. Classes of Work: A) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances.