Specifications include, but are not limited to: 1. Application of a new acrylic surface on existing asphalt tennis courts. 2. The correct amount of sand is to be added per barrel of surface material to create the requested court speed of an ITF Pace Rating of 2 (Medium Slow). 3. The contractor must ensure the surface to be coated is sound, smooth, and free from dust, dirt, or oily materials. 4. The existing tennis net posts on courts 9, 10, and 11 are to be removed. Sixteen new pickleball net posts are to be installed. The existing asphalt will need to be cut out and the new net posts should be stabilized in concrete. Eight pickleball nets will need to be provided for the new courts and that cost should be reflected in the bid. 5. In addition to the net posts, new fencing should be installed between each pickleball court. This fencing is requested to be 4 feet in height. The amount of 4-foot-high fencing will equal 444 linear feet in total. An additional 10-foot-high fence is to be installed separating the new pickleball courts and the existing tennis courts. The linear feet of the 10-foot-high fencing should equal 117. All the fencing to be added is displayed by red dots and dashes in attachment #1. All new fencing should be black with a vinyl coat. 6. Three new 8-foot-long cabana benches are to be installed at the center intersection points between the pickleball courts. The locations are marked by blue rectangles in attachment #1. The cabana benches selected are manufactured by SunTrends, Inc. The exact models are the 8-foot, direct burial, two sided flat, with a pacific blue canvas color. Three additional 8-foot-long cabana benches are to be installed on the existing tennis courts where the current benches are located. These locations are between tennis courts 2 and 3, 4 and 5, as well as 6 and 7. This results in a total of 6 cabana benches that need to be provided. The pre-existing canopy benches will need to be removed. The city will provide an area for disposal. 7. The fences, net posts, and cabana benches should all be installed prior to the new court surface being installed. Prior to the application of surfacing materials, the entire surface should also be flooded, and checked for minor depressions or irregularities. 8. An acrylic patch binder will be applied to all low areas. Tack coat patch material shall be applied to all needed areas and allowed to dry thoroughly prior to applying patch binder. After patching, the surface shall not vary more than 1/8 inch in ten feet measured in any direction. 9. A fiberglass membrane overlay crack repair system should be installed over all existing cracks. The city has selected the Rite Way Tru-Bounce Crack Repair System but will consider accepting the bid of a “true equivalent”. There are an estimated 900 feet of cracks on the current surfaces which is to be resurfaced. 10. One coat of black acrylic resurface material should be applied to the surface using a rubber bladed squeegee to provide a smooth surface. After this application, all court pinholes should be filled and covered to provide an even surface. No application shall be covered by a succeeding application until the layer is thoroughly cured. 11. Two coats of colored acrylic surface material shall then be applied by rubber bladed squeegee on the clean, dry surface. No application shall be covered by a succeeding application until previous application is thoroughly cured. 12. The finished surface shall have a uniform appearance and be free from ridges and tool marks. 13. USAPA and USTA regulation playing lines shall be installed by applying textured white line paint after the final surfacing agent has thoroughly cured. 10 and under USTA lines are to be installed on tennis courts 7 and 8. 14. Installation of the surfacing materials shall not be conducted during rainfall, or when rainfall is imminent. The air temperature must be at least 50 degrees Fahrenheit and rising. Surfacing materials may not be applied when the court surface temperature is above 130 degrees Fahrenheit. 15. The existing tennis nets are to be re-installed on the 8 tennis courts after resurfacing has been completed.