Specifications include, but are not limited to: Exterior work: A. The Contractor shall build out overhangs on each end of house. Overhang shall be 24- inches wide to match overhang on the front and back of house. B. The Contractor shall remove shingles and cut roof sheathing back to second and third trusses and make new decking longer to come out even with overhang on both ends of house. New sheathing shall be the same as existing. C. The contractor shall remove soffit and facia on front and back of house and shall install new rafter tails cut the same pitch as the roof to ensure facia is 100 percent vertical or plumb. Facia boards shall be 2-inch x 6-inch spruce. D. The Contractor shall remove the existing cricket on the chimney and shall construct new larger cricket with the valleys passing the corners of the chimney. E. The Contractor shall delete two (2) wind turbines and one (1) exhaust vent and patch holes with same roof sheathing as the existing roof sheathing. F. The Contractor shall install ice and water shield around perimeter of building, and install synthetic felt on entire roof. Install drip edge around entire building and new pipe boots. G. The Contractor shall install new GAF Timberline HDZ shake wood color shingle or equal. Install new omni coil ridge vent and install shingle ridge cap to match shingles or equal. Park shall supply all roofing materials. All lumber, the Contractor shall supply plywood, and framing materials. H. The Contractor shall build front deck 6-foot x 6-foot using 6-inch x 6-inch posts 2-inch x 10-inch joists with 5/4-inch decking, all materials shall be pressure treated, with steps and install black powder coated aluminum handrails around deck and down steps to sidewalk. The Contractor shall form and pour concrete sidewalk 4-foot wide x 46-feet long and 4-inches thick with three (3) rolls of ½-inch rebar from deck to driveway. I. The Contractor shall build a 6-foot x 6-foot side deck using 6-inch x 6-inch posts, 2-inch x 10-inch joists and 5/4 decking; all materials shall be pressure treated. Build steps down to concrete slab, install black powder coated aluminum handrails around deck and down steps. The Contractor shall install 8-foot x 8- foot shed type roof over deck. J. The Contractor shall install eleven (11) new construction vinyl windows with nailing fin, windows shall be almond color. Windows shall be single hung energy star low E glass with no grids between glass. Three (3) of the windows shall be mulled together to make one unit. This will be a total of eight (8) single windows and one (1) triple unit. The Contractor shall install 4-inch window tape around edges of all windows for weather tight seal. K. The Contractor shall install three (3) exterior door units, 1. Side door shall be 32-inch LH hinge 9-lite with blinds between the glass, insulated metal door standard height and jambs, dead bolt bore. 2. One set of French doors on rear of house; doors are standard height and standard jambs, 6-foot-wide right-side door opens with LH hinge, dead bolt bore and shall have full view windows with blinds between the glass, doors shall be insulated metal doors. 3. Front door shall be Craftsmen's style with side lite and privacy glass on door and side lite, insulated metal door, deadbolt bore, standard height and jambs. Doors shall be painted using two (2) coats Sherwin Williams lifetime warranty paint; park staff shall choose color. All doors shall have new doorknobs and deadbolts that are keyed alike; park staff shall pick hinge and doorknob colors...