Specifications include, but are not limited to: • Contractor shall demolish entire structure to include contents of structure, support pads and beams, and pre-fabricated concrete steps leading to building on multiple entry points. • Contractor shall disconnect all utilities to building: o Electrical (Facility Engineers (FE) will be responsible to have electrical power disconnected). o Water Supply (FE will assist in locating water supply line, however Contractor shall be responsible for terminating water supply line outside of construction area.) Water line will be completed with a valve box placed with valve sized accordingly with water supply line. o Contractor shall remove entire sewer system within the building footprint area to include all buried sewer lines. Contractor shall cap existing outfeed lines from manhole. • Contractor shall be responsible for all debris removal and disposal off Louisiana National Guard grounds, a dumpster shall not be provided by DMA. • After removal of debris from site, Contractor shall place fill dirt where building footprint was located and in any disturbed areas on site. • Contractor shall establish sheet flow drainage at the site. • Contractor shall plant grass seed and spread fertilizer on all disturbed areas on site. Stabilize any washouts areas eroded more than 2 inches in depth. Spread un-hulled Bermuda, Bahia, and Lespedeza at 25 pounds per acre. Fertilizer spread rate: 13-13-13 at 615 pounds per acre. • Contractor shall be responsible for executing Louisiana One Call to remove existing structure to ensure no buried utilities will be damaged.