- Provide directional drill or hydro burst equipment winch that shall be used for the slip lining of a 30" HDPE through an existing 36" Concrete Carrier pipe. The maximum length of pipe to be installed shall be 1240 feet. HDPE pipe weighs approximately 116lb/ft. Provide sufficient rods to perform the longest pull. Weekly rental cost shall also include training on the equipment. Owner will be responsible for loading and offloading equipment, placing equipment in trench. Owner will have all pipe staged and ready for the pulls. There will be 2-600 ft pulls, 1 -900 ft pull and 2 - 1200 ft pulls. The receiving pits depths range from 7ft to bottom of ditch to 10 ft. Owner will ensure that pits are safely excavated. Owner will provide a pull head with a 3.25 inch diameter eye Series 651 poly-cam fitting.