Specifications include, but are not limited to: • Permit costs • Removal and disposal of all debris to include magnet sweeps of the areas to get nails • Photographic evidence of the conditions during all steps in the installation process • Include a count of twenty 4’x8’ sheets of decking. FRT as required by code and CDX can be used where appropriate • Removal and re setting of split system HVAC units • Warranties o Provide, at completion of the project, completed, submitted, and approved warranty documents (25 to 30 year for shingles 20 year NDL for flat) o Contractor shall install approved materials to the manufacture’s installation procedures, all materials must be single sourced from the roofing manufacturer supplying the warranties; Bid Additions for entire project • Price per sheet replacement • Roof drain replacement on a per drain basis • Replace any facia or rake boards that are water damaged and metal wrapping them (8’sections) • Replace any soffit at full length based on gutter length, if necessary, based on provided information. • Replace any gutters with like gutters and downspouts