Specifications include, but are not limited to: : Supplier shall provide services for pumps and motors including, but not limited to, the following requirements: a. Pulling and repairing various types of pumps. b. Replace and provide new pumps. c. Provide installation services, vibration analysis, dynamic services. d. Pulling and repairing/rewinding various types of motors. e. Replace and provide new motors. f. Provide installation services, vibrations analysis, onsite megger testing, alignment services dynamic balancing. g. Pulling and repairing deep well pumps. h. Videoing wells, brushing and bailing well casings, decommissioning wells. i. Dismantle and inspect equipment. j. Clean all internal and external parts. k. Repair or replace shaft, shaft sleeves, packing, couplings, pump bearings, oil rings, oil or grease seals, impellers, pump casing impellers, bushings, mechanical seals, gaskets, epoxy or ceramic coat inside and out, balance reassemble, paint, and test. l. Replace all thrust and guide bearing, dynamic balance rotator. m. Assemble, test and paint, vacuum pressure impregnation (VPI) and resin treat the windings. n. Calibrate speed controllers, tachometers, and controls. o. Provide thermal analysis. p. Provide dynamometer load testing. q. Installation and precision alignment. r. Static and dynamic motor testing. s. Remove rust. t. Protect painted surfaces from damage. u. Disinfect portable water equipment with National Science Foundation (NSF) approved products. v. Align shafts and motors. w. Report piping strain issues during installation to Director of Maintenance and or the Director of Facilities of Optimization Services or designee. x. Disinfect well equipment recognized by the ANSI/AWWA C651-14 before installation. y. Provide lifting equipment cranes, forklift to move pumps safely, motor/pump combinations and accessories weighing up to two tons. z. Provide cleaning capability, power wash, steam cleaning and sandblasting equipment. aa. Provide machine tools, micrometer, gauges, etc. bb. Provide welding equipment, stick, tungsten inert gas (TIG) and metal inert gas (MIG). cc. Provide hydraulic bearing pullers and induction bearing heater. dd. Provide lathes, milling machine and drill press of sufficient size. ee. Provide static balancing equipment. ff. Provide vertical turbine bowl rack for proper disassembly and assembly. gg. Provide shaft straightening rack. hh. Provide industry standard on all material and workmanship, recognized by the American Water Works Association (AWWA) standard A100-6 for water wells and AWWA standard E103-07 for horizontal and vertical line shaft pumps. ii. Provide work on motors and submersible pumps with closely coupled motors and shall be equipped.