Contractorshall: a. Procure all materials, supplies, and window units to specifications which includes a bottom vent operating window, to complete the project. b. Clean and prep window opening for installation of new window units. c. Install windows and insulation to manufactures specifications and building code. d. All interior and exterior āLā trims to be of the same color as the new window frames and per blueprint drawings. e. Caulking/sealant to be color matched Dowsil Manufactured by Dow Corning. f. All measurements and proper fit are the responsibility of the contractor. g. Building to be secured and weatherproof during construction. h. All work to look and be completed in a professional manner. i. Provide final washing and cleaning of the installed components. j. No pre-bid meeting required. INSTALLATION. a. Contractorshall furnish and provide all materials, tools, and incidentals necessary to complete the project in full. b. Contractor will load and off-load all equipment, materials and shall sign for all deliveries necessary/pertinent to the project. c. Contractorshall move and set all equipment in place. d. Contractor is responsible for adhering to all required federal, state, and local lawsto include any pertinent building codes, permits, environmental considerations, etc.