Section 1 shall include all sides and all surfaces of the 4th level (The Penthouse has already been completed and is not included in this project). Section 2 shall include all west elevations from ground through 3rd level including the west staircase. Section 3 shall include all south elevation surfaces from ground level through 3rd level including the south staircase. Section 4 shall include the North elevation form ground level through 3rd level including the North staircase. Section 5 shall include all east elevations from ground through 3rd level including the north and south facing inset walls within the courtyard area, however the two garage areas are excluded from this section. Section 6 shall include the two garages on the east side the of the building, one being the chiller garage along the courtyard driveway and the other being the garage located within the inset on the center east side of the building.