Specifications include, but are not limited to: 1. Exterior concrete ramp for access to First Floor. 2. Replacement of existing brick floor @ Basement with a concrete slab on grade. 3. Waterproofing of Basement masonry walls 4. Replacement of Third Floor Ceiling. 5. Mechanical Work, including: a. Installation of new underground gas service from Lincoln Street (by the utility company). b. Basement boiler and water heater replacement. c. Replacement of existing fan coil units at First and Second Floors. d. Addition of fan coil units at select locations. e. Replacement of air handling units at Gymnasium and Basement. f. Installation of exhaust fans at First and Second Floor toilet rooms. g. Installation of exhaust fan and ductwork at Third Floor 6. Electrical Work including: a. Upgrade of building electrical service b. Work related to installation of mechanical equipment. c. Removal and reinstallation of Third Floor heat detectors and lighting related to ceiling replacement. 7. Site work related to installation of exterior ramp, electrical and gas services 8. Hazardous Materials abatement related to architectural & MEP work.