Specifications include, but are not limited to: Torrington Board of Education is seeking a request for a quote (RFQ) for the DAS IAQ HVAC Inspections and Evaluations Requirements for the following: Torrington Middle School, Torringford, Vogel-Wetmore School and Southwest School, Add Alternative Forbes School. The inspection and evaluation shall include, but may not be limited to: ● Testing for maximum filter efficiency ● Physical measurements of outside air delivery rate ● Verification of the appropriate condition and operation of ventilation components ● Measurement of air distribution through all system inlets and outlets ● Verification of unit operation and that required maintenance has been performed in accordance with the most recent indoor ventilation standards promulgated by ASHRAE ● Verification of control sequences ● Verification of carbon dioxide sensors and acceptable carbon dioxide concentrations indoors ● Collection of field data for the installation of mechanical ventilation if none exist. ADD ALTERNATE ONE: Forbes School with the same specifications as above. ADD ALTERNATE TWO: The chosen company will carry out functional evaluations of HVAC equipment, related mechanical systems, provide designs and specifications for the construction of those systems that are obsolete or at the end of their useful life. In order to qualify for HVAC Indoor Air Quality Grants for Public Schools from the Department of Administrative Services, both now and in the future, these services must include the necessary design and specifications. The inspection and evaluation shall include, but may not be limited to: ● Description of HVAC replacement or additions ● Cost estimates for A&E services ● Cost estimates for potential equipment ● Cost estimates for construction; ADD ALTERNATE THREE: Forbes School with the same specifications as Add Alternate Two.