This project includes the construction of an interconnection loop between the Auburn Water District’s water supply system and the City of Worcester’s water supply systems including a pressure reducing / metering facility (excluding prefabricated building shell and exterior water mains installed by others in 2023) and pipe jacking beneath Kettle Brook and the Genesee & Wyoming Railroad. The Work consists of furnishing and installing the interior equipment within the existing 12’x21’ prefabricated building such as, a 6-inch pressure reducing valve, 6-inch magnetic flow meter, 6-inch ductile iron piping and appurtenances, instrumentation and electrical equipment, and associated site work. The work also includes pipe jacking of a 220-foot long 24- inch diameter steel casing beneath Kettle Brook and the Railroad and associated 12” ductile iron water main, valves and fittings to complete the connection from Southbridge Street to Sword Street as shown on the contract drawings.